Detailed Install Instructions for Bulkhead Fittings
Checklist Refore You Buy
Check the chemical compatibility chart for your materials before you buy...Call if you are unsure...We're Available to Help: 800-849-3030
Checklist Before You Install
Cross check the Spec Sheet and the Install Instructions from the maufacturer of your bulkhead before you begin
Make sure you have your neccessary tools handy
Drill
Appropriate diameter hole saw
Grease Pencil or Marker
Scrap plastic or wood for testing your hole
Crescent Wrench
Ensure your tank is in good condition and is compatible with your new bulkhead
Drain the tank below the fitting location
Check your bulkhead for any defects or missing pieces
BULKHEAD FITTING INSTALLATION
Drain the tank and mark the appropriate center point on the outside of the tank
Cut a hole in your test / scrap piece and ensure proper fit of the tank adapter. The bulkhead should pass into the hole but have no more than a 1/16th inch of side-to-side play. Proper diameter is determined by measuring the outside thread diameter of the fitting body and checking the manufacturer specification sheets.
Once you are sure about the hole size, drill the hole in the tank and put the bulkhead (including the gasket) through from the inside of the tank
Hand tighten the nut from the outside and be sure, if you have installed a siphon tube, that it is facing the correct way.
Due to expansion and contraction of the tank walls, it is best to us flexible connections between tank fitting and rigid pipe or pump.